České Budějovice Hospital - parking garage

Location: České Budějovice Project size: 9,800 m² Product: KOREFIB® FiberMesh 4×100×100 Application: structural topping over Spirol panels

Reinforcement of the structural topping over load-bearing Spirol panels as part of the parking garage project at České Budějovice  Hospital.

A combination of steel and composite KOREFIB® FiberMesh 4×100×100 meshes was used in the structure.

Nymburk Ice Arena - facilities

Location: Nymburk Project size: 1,250 m² Product: KOREFIB® FiberMesh 4×100×100 Application: floor structure of the ice arena facilities

Supply of KOREFIB® FiberMesh 4×100×100 composite meshes for floors as part of the reconstruction of the Nymburk ice arena facilities.

The total project area was approximately 1,250 m².